The Chicago Transit Authority (CTA), as part of its CTA Purple Line Track Renewal program, will be closing one lane of traffic on Greenwood St. between Sherman Ave. and Sherman Pl. from August 10-11 to perform work.

The work includes the craning of equipment and material from the south lane of Greenwood St. between Sherman Ave. and Sherman Pl.

One lane of traffic will be maintained for both directions of traffic utilizing traffic control measures. Parking in the area will be restricted as needed. The sidewalk on the south side of Greenwood St. will be closed. There will be flaggers assisting pedestrians and traffic at all times   during working hours (8 a.m. to 5 p.m.).