On Aug 25, nearly 300 students, family members, and staff gathered at Lincoln Elementary School for the ribbon cutting and dedication of the new playing field and the unveiling of the new Lincoln vision statement. The old field doubled as a storm water retention basin, and was not usable during much of the year. To create the new field, which is now at ground level, the District installed an underground storm-water detention system.