Advanced Search

Evanston RoundTable | Evanston, IL
The Weather Network
Ice House Gallery


home : city news : city news
December 11, 2018

11/28/2018 2:11:00 PM
Homes Shake Near Construction Site of Pumping Station
Large backhoe shown at the pumping station site.                   RoundTable photo

Large backhoe shown at the pumping station site.                  
RoundTable photo

By Larry Gavin


The homes of a number of people residing near the construction site of the new pumping station at 2525 Church St. shook when a large backhoe raised and lowered its shovel to break up concrete pipe on Oct. 31. Several homeowners told the RoundTable that their homes vibrated and shook so much that cracks appeared in portions of the ceilings and walls.

The Morton Grove/Niles Water Commission (MGNWC) is constructing the water pumping station to boost the pressure of water that the City of Evanston has agreed to provide to MGNWC.

Kirk Hipps, a Resident Engineer with Stanley Consultants retained by MGNWC, said in an email to one neighbor at about 4 p.m. on Oct. 31 that the contractor, Bolder Construction, had been notified of the complaints to date. He added, “The noise and vibrations were generated while they were crushing concrete pipe before shipping it off site. Fortunately, all of the pipe has been crushed and they are loading it out for removal.”

MGNWC told residents in an update that “large backhoes were used and the operation of that machine caused some vibrations to carry further from the site than anticipated …” The update also told neighbors to contact Mr. Hipps, if they had any questions.

Mr. Hipps told the RoundTable the neighbors need to submit claims to the contractor, and that the contractor or the contractor’s insurance company would decide whether any damage to homes was caused by the vibrations and if they would repair any of the damage. When asked who to contact about the status of the claim procedure, Mr. Hipps told the RoundTable to contact William Balling, who has served as Principal of MGNWC.

In an email on Nov. 23, the RoundTable asked Mr. Balling what the status of neighbors’ claims was and how MGNWC and the contractor plan to address the claims. Mr. Balling did not respond before this  paper went to press on Nov. 28.







Article Comment Submission Form

The RoundTable will try to post comments within a few hours, but there may be a longer delay at times. Comments containing mean-spirited, libelous or ad hominem attacks will not be posted.

Note: Your full name is required. Your telephone number and e-mail will not be posted. You may type your comments in the space below, or you may type them in a word document and cut and paste them in the space below.

Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   



Click to View Upcoming Events
<December>
SMTWTFS
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
Submit Event







HomeVideosCommunity PostsObituariesClassifiedsAdvertiseAbout UsContact UsLife
Copyright 2008-17 - Evanston RoundTable LLC, Evanston, IL 60202, 847-864-7741, All Rights Reserved


Software © 1998-2018 1up! Software, All Rights Reserved


: